New home handover checklist: what to inspect before you take the keys

Table of contents

  1. How to prepare for the handover inspection
  2. Structure and exterior
  3. Interiors and finishes
  4. Plumbing, electrical and services
  5. Documents to collect at handover
  6. What to do if you find defects
  7. The last word
  8. FAQs

Key takeaways

  • Inspect in daylight with your drawings, contract specifications, spirit level, torch, and phone camera before you accept the keys, so you can date and document every finding.
  • Test every service by using it: open every tap, operate every switch and socket, ask for the electrician's earthing test record, and press the test button on the residual current circuit breaker.
  • Collect your documents on the day and before final payment, including as-built drawings, the approved plan, warranty cards, and, if your plot needs them, completion and occupancy certificates.
  • Record every defect in writing with a dated photograph, agree on a rectification date for each one, reinspect before final payment, and sign off.

Handover is the easiest moment to get defects fixed. Once you accept the keys and make the final payment, it becomes harder to show that a fault existed before handover. A new home handover checklist keeps your inspection methodical and gives you a written record to refer back to. This guide covers how to prepare, what to inspect inside and out, which documents to collect, and what to do when you find a defect.

How to prepare for the handover inspection

Prepare before the day: agree on a daylight slot with your builder, carry your paperwork and basic tools, and decide who will join you. Tick items off as you go through the sections below.

  • Schedule the visit in daylight so you can judge walls, floors, and paint in natural light.
  • Bring your drawings and the specification list, including the agreed materials, brands, and finishes in your contract.
  • Pack a torch, spirit level, measuring tape, and phone camera, and photograph each defect you find.
  • Consider an independent engineer, who can assess structure and services that are hard to judge by eye.

With JSW One Homes, payments follow construction milestones and you receive regular progress updates with photos and reports before handover, and the construction process guide walks through each stage.

Structure and exterior

Check cracks, finishes, drainage, and access covers outside, starting at the terrace. Walk the outside of the house in one direction with the table below so you don't miss anything. Leave judging a crack to an engineer and just record it.

Item

What to check

Status

Cracks

Walk every wall, beam, and slab edge; mark each crack's location on your drawing

☐

Plaster finish

Run your hand along walls for ridges, patches, and loose plaster

☐

Terrace slope and drainage

Pour water on the terrace; it should run to the outlets and not pool

☐

Parapet and waterproofing

Check the parapet base, joints, and coating for gaps or patchy work

☐

External paint

Look for drips, peeling, uneven coverage, and mismatched shades

☐

Compound wall

Check alignment, finish, and that its position matches the approved plan

☐

Gate

Open and close it fully; check hinges, latch, lock, and alignment with the posts

☐

Sump and septic covers

Check that each cover sits flush, is secure, and can be lifted for access

☐

Interiors and finishes

Check every room in the same order, from floor to ceiling, and operate every door, window, and fitting. Compare what you see with your drawings and specification list.

  • Tiles: tap each tile lightly and listen for hollow sounds, then check that joints are even, grouting is complete, and edges are intact.
  • Floor levels: lay your spirit level across floors and thresholds, and mark any slope or step that differs from the drawings.
  • Doors and windows: check alignment, smooth opening, locks and seals, and look for gaps when closed.
  • Interior paint: look for patchy coats, roller marks, and stains on interior walls and ceilings.
  • Kitchen platform: check level, edge finish, sink cut-out fit, and gaps against the wall.
  • Wardrobes, if included: open every door and drawer and check hinges, alignment, and finish against the specification list.

Plumbing, electrical and services

Test every service by using it, because faults in pipes and wiring rarely show on a visual check. Work through plumbing first, then electrical, and note anything that behaves differently from point to point.

Plumbing and drainage

  • Water pressure and leaks: open every tap and shower, check the flow is steady, and look under basins and behind fittings for drips.
  • Drain flow: run water into every basin, sink, and floor trap and check that it drains without pooling or gurgling.
  • Wet-area slopes: pour water on bathroom and balcony floors and watch it run towards the drain.

IS 1172:1993 is the BIS code of basic requirements for water supply, drainage, and sanitation, and an engineer can check your plumbing against it.

Electrical and power

  • Switches and sockets: operate every switch, test every socket with a tester, and check that lights and fans respond.
  • Earthing: ask where the earth connections are and for the electrician's test record.
  • Distribution board, the panel of switches and breakers: check that every breaker is labelled to its circuit.
  • Residual current circuit breaker (RCCB), which cuts power when current leaks to earth: press its test button; it should trip, then reset. If it does not trip, call an electrician before you accept that circuit.
  • Meter readings: photograph and record each meter reading, with the date, at handover.
  • Solar or inverter, if included: switch it on, check that it runs, and ask the installer for the written test results and the manual.

Ask the electrician which code they tested the earthing against. IS 3043:2018 is the BIS code of practice for earthing.

Documents to collect at handover

Collect your documents on the day and before final payment, because they prove what was built and what is covered. Ask for originals or certified copies of each item and keep your own dated set. Ask your builder which items will be ready on the day, so any gap is on record before you sign.

  • Completion certificate, which records that construction is finished, and occupancy certificate, the local authority's permission to live in the building: ask your local authority whether your plot needs them.
  • As-built drawings, which show the home as it was actually built, including concealed pipes and wiring.
  • The approved plan.
  • Material and appliance warranty cards.
  • The contractor's written warranty terms.
  • Utility connection papers.
  • The final bill and payment receipts.
  • A key inventory listing every key, lock, and remote.

Your local authority sets the procedure for these certificates. The Greater Hyderabad Municipal Corporation's occupancy certificate application lists the building completion certificate, a copy of the sanctioned plan, water connection details and an electricity bill among its enclosures. Hyderabad owners can read the wider approvals and permissions guide for Hyderabad.

What to do if you find defects

Record every defect as soon as you see it, list it in writing, and agree a rectification date. Keep your messages and photographs together so the record stays factual.

  1. Photograph each defect with a date and note its exact location.
  2. List every defect in a snag list and send it to your builder in writing.
  3. Agree a rectification date for each item, also in writing.
  4. Re-inspect the repaired work before final payment and sign-off, so you check the repair instead of assuming it.

Once you have moved in, ongoing upkeep becomes a separate routine.

The last word

A careful hour at handover saves months of follow-up. Inspect methodically, put every defect in writing, and collect your documents before the final payment.

If you are still planning your build and own a plot of 1,500 sq ft or more, subject to a site check, in the cities JSW One Homes serves, book a consultation to start. With JSW One Homes, you receive regular progress updates through construction, and handover comes with one-year defect liability support, a structural stability certificate and a five-year structural warranty.

FAQs

Should I hire an engineer for a handover inspection?

Yes, for structure, waterproofing, and services, which are hard to judge by eye. An independent engineer can tell a cosmetic crack from a concerning one, properly test electrical and plumbing systems, and put findings in a written report you can attach to your snag list. Even without one, a home handover checklist, dated photographs, and written confirmation of each fix give you a solid record.

Can I move in before snags are fixed?

Yes, as long as you agree to the fixes in writing first. Resolve safety items, such as electrical faults, leaks, or an unfinished parapet, before you move in, and agree on dates for cosmetic items such as paint touch-ups. Moving in can make it harder to show the condition at handover, so keep your dated photographs and a signed copy of the snag list.

What is a snag list?

A snag list is a room-by-room record of small defects and unfinished items, such as a misaligned door or a chipped tile. Keep one copy and send one to your builder so both sides work from the same list. Each entry needs a location, a dated photograph, and a rectification date. Tick an item off only after you have checked the repair yourself.

Should I hold back payment until defects are fixed?

Usually, yes: release the final payment only once your snag list is closed, if your contract allows it. Payment terms differ between builders, so check your contract first. If it allows part payment after handover, agree in writing which defects must be fixed before you release that portion, and keep your messages and photographs so any discussion stays factual.

Which documents must I get at handover?

The essentials are the ones that prove what was built and what is covered: the as-built drawings, the approved plan, the warranty terms, and, where your local authority requires them, the completion and occupancy certificates. If any document is not ready on the day, ask your builder for a written date for it and hold the related payment until it arrives. Keep originals or certified copies together in one dated file.

What handover support does JSW One Homes provide?

With JSW One Homes, your handover comes with one-year defect liability support, a structural stability certificate, and a five-year structural warranty, as the How it works page sets out. Keep your dated snag list and photographs, so any defect you report after handover has a clear record.

What are the design fee, timeline, and service area for JSW One Homes?

You start with a meeting, then make the design phase payment to begin the design phase. Construction time depends on factors such as the number of floors, plot conditions, and site readiness, and planned milestones are shared as part of the project plan. JSW One Homes works with plots of 1,500 sq ft or more, subject to a site check, in the cities it serves.