Pre-construction anti-termite treatment: five stages and how to check each

Table of contents

  • Why treat the soil before you build?
  • The 5 stages of pre-construction treatment
  • Choosing an anti-termite chemical
  • How to check the work at each stage?
  • Warranty and records
  • The last word
  • FAQs

Key takeaways

  • Treat the soil in five stages, from trench bottoms to the external perimeter, because the work that follows buries each stage.
  • The national standard for pre-construction treatment lists three chemicals, chlorpyrifos, imidacloprid and bifenthrin, so choose by registration and product label, never by brand name.
  • Spray only when it is not raining and the soil is not wet with rain or subsoil water, and let the chemical soak in before concrete or the floor base covers it.
  • Check every stage as it is sprayed, with a dated photo, the product label and batch number, and the litres used against the area treated.
  • A treatment warranty is only as strong as your stage-wise records, so ask for its written terms before work starts.

Termites reach a house from the soil beneath it, and the easiest time to stop them is before the floor goes down. If you are about to start foundations, pre-construction anti-termite treatment is a job you cannot easily inspect or repeat once it is buried. Here is how the five stages work, how to choose a chemical, and how to check each stage.

Why treat the soil before you build?

Treating the soil before construction helps prevent termites from entering a building through its foundation. Pre-construction anti-termite treatment involves applying an approved termiticide to the soil to create a protective chemical barrier between the ground and the building. This barrier helps kill or deter termites as they attempt to enter the structure. Once that soil is buried, it cannot be sprayed again without drilling through the finished structure.

Subterranean termites nest in the soil and enter a building from ground level, under the foundation and up through the floors. They bypass concrete in search of food, so a floor slab alone does not stop them. This is how Indian Standard (IS) 6313 (Part 2):2022 from the Bureau of Indian Standards (BIS) describes their entry. Treating the soil after the floor is laid falls under IS 6313 (Part 3):2022, written for existing buildings.

If your plot is being soil-tested before foundations, plan the treatment at the same time. See why soil testing matters before you build.

The 5 stages of pre-construction treatment

Anti-termite treatment for a foundation runs in five stages that follow the building upwards. IS 6313 (Part 2):2022 specifies the chemical emulsion application rate for each stage in litres per square metre (sq m) of the treated surface.

Apply the treatment when the soil is absorbent. Do not carry it out during rain or when the soil is wet from rain or subsoil water. Once formed, treated soil barriers should not be disturbed. If any treated soil is disturbed, restore the continuity of the chemical barrier immediately.

The rates below come from the code’s clauses for masonry foundations. For reinforced-concrete foundations, where treatment starts 500 mm below ground level, ask your structural engineer which clause applies.

Bottom and sides of foundation trenches and column pits

Column pits are the holes dug for each column footing. Once excavation is complete, spray the bottom and sides, up to about 300 mm, at five litres per sq m. Lay mass concrete only after the chemical emulsion has been absorbed by the soil and the surface is quite dry.

Backfill around foundations and plinth walls

Backfill is the earth returned around foundations and plinth walls, the walls that lift the floor above ground level. Spray the backfill touching the structure at 7.5 litres per sq m of vertical surface, on each side, in layers as the earth goes back.

If you use water to ram the fill, treat after ramming: rod the earth at 150 mm centres, parallel and close to the wall, spray the chemical emulsion, then tamp the soil back in place (press it down firmly). The plinth beam guide explains the beam that sits on these walls and the checks before it is poured.

Top surface of plinth filling before flooring

Plinth filling is the compacted earth inside the plinth walls. Spray its whole top surface at five litres per sq m before the sub-grade, the prepared base for the floor, goes on. If the rammed earth is too hard for the liquid to soak in, make holes 50 mm to 75 mm deep at 150 mm centres to help the emulsion penetrate the soil.

Junction of wall and floor

This stage seals the gap where the wall meets the floor. Along every wall and column base, cut a 30 mm by 30 mm channel, make rod holes (holes made with a metal rod) 150 mm apart inside it, and pour 7.5 litres of chemical emulsion per sq m of vertical wall or column surface to treat the soil along the junction. Carry out this treatment before laying the floor sub-grade. Tamp the soil back afterwards.

External perimeter after backfilling, including pipes and conduits

After backfilling, once the building is complete and the outside ground is graded, rod the earth beside the walls at 150 mm intervals to a depth of about 300 mm. Move the rods backwards and forwards, parallel to the wall, to loosen the soil. Then pour 7.5 litres per sq m of vertical surface and tamp the earth back to restore the soil around the foundation. Treat to the full depth where the fill is deeper than 300 mm. Where a pipe or conduit enters the soil, loosen the soil 150 mm around it and 75 mm deep first.

Choosing an anti-termite chemical

People often ask for the best anti-termite chemical for a foundation, but the right choice depends on the approved active ingredient and formulation, not just the brand. IS 6313 (Part 2):2022 lists three active ingredients, the part of a product that acts on termites: chlorpyrifos, imidacloprid and bifenthrin.

The code allows only chemicals and formulations on the approved list of the Central Insecticides Board and Registration Committee (CIB&RC) at the time of application. The government’s list of insecticides registered for household and public health use, as on 31 July 2026, shows a registered termiticide for each of the three. Ask the operator to show the registration details on the label.

The code notes that imidacloprid is non-repellent and odourless, while chlorpyrifos and bifenthrin are repellent and have a noticeable odour. Read each product’s Material Safety Data Sheet (MSDS) and the manufacturer’s hazard guide before any spraying to understand the product’s hazards and handling precautions.

Hire a licensed pest-control operator. The code requires a trained professional agency with a valid licence issued by the respective state or central government department of agriculture to carry out anti-termite treatment.

The chemicals used for soil treatment can be hazardous if inhaled, swallowed or absorbed through the skin. Follow these precautions:

  • Workers should wear gloves, goggles, face masks, safety shoes, ear muffs and a cap.
  • Containers must be clearly labelled, closed and out of reach of children and pets.
  • Prevent chemicals from contaminating wells, springs and other drinking-water sources.
  • Check the MSDS for risks to aquatic life, bees and other non-target organisms.

How to check the work at each stage?

Check each stage on the day it is sprayed, while the soil is still open. The table gives one check and one record per stage.

StageWhat to checkEvidence to keep
1. Trenches and pitsWhole bottom and sides sprayed before any concrete; surface dryDated photo of each pit before concreting
2. BackfillEach layer sprayed as it goes in, along the full wall heightPhoto of each layer; litres used against wall area
3. Plinth fillingWhole top surface wetted evenly, with no dry patches or puddlesPhoto of the surface; product label and batch number
4. Wall-floor junctionChannel sprayed around every wall and column base before the sub-gradePhoto of the channel along each wall
5. External perimeterSprayed after final grading, with soil loosened around each pipe or conduit firstDated photo; note confirming no rain that day

Warranty and records

A treatment warranty is the operator’s written promise to repeat treatment at no extra cost if termites reappear in the treated area during the warranty period. Its value rests on proof that the work was done as specified, which stage-wise records provide.

IS 6313 (Part 2):2022 sets no fixed protection period, since effectiveness depends on the chemical, the dose and thorough application, so the warranty term is a contract matter. Terms vary between operators, so ask for the period, the cover and what voids it before you sign.

Keep a signed record of each treatment stage, including its date, chemical name, formulation, batch number, concentration, dilution, application rate, quantity used and area treated. Retain photographs of each stage along with the treatment completion certificate and warranty document.

The last word

Treated soil is covered for good, so the record of each stage is all you will have once the floor goes down. A dated photo, the product label and a signed note for every stage give you that proof. If you own a plot of 1,500 sq ft or more, subject to a site check, in the cities JSW One Homes serves, book a consultation with JSW One Homes.

FAQs

Is anti-termite treatment necessary before construction?

Yes. Once the floor and walls are built, you can no longer spray the soil beneath them, so every trench, pit and plinth filling needs its dose while it is exposed. Waiting for signs of termites means treating a finished building. Ask your contractor to put the treatment in the written scope, with a record for each stage.

Which chemical is used for anti-termite treatment of foundations?

IS 6313 (Part 2) lists three: chlorpyrifos, imidacloprid and bifenthrin, each mixed with water. The code lets you use only products approved for this use at the time. Which one you use depends on its label, registration details and Material Safety Data Sheet (MSDS), so ask the operator to show all three before spraying begins, and don’t accept a brand name alone.

How long does pre-construction termite treatment last?

IS 6313 (Part 2) sets no fixed life for it, because protection depends on the chemical chosen, the dose and how thoroughly it is applied. The period that matters to you is the warranty, which is a contract term, so get it in writing. The code says disturbed treated soil must be restored at once, so tell the operator before anyone digs near the walls.

Is anti-termite treatment safe for children and pets?

It can be, if the site is managed carefully. The chemicals are poisonous if inhaled, swallowed or absorbed through the skin, but most pre-construction treatment happens on open soil before the house exists, so the risk sits on site. Keep children and pets away until spraying is finished and the treated soil is covered. Ask the operator for the product’s Material Safety Data Sheet (MSDS), keep containers closed and out of reach, and make sure no chemical reaches drinking-water sources.

Can treatment be done after the floor is laid?

Yes, but it is a remedial job under IS 6313 (Part 3), written for existing buildings, because by then the soil under the floor and foundations is no longer open and it is harder to confirm that every part received its dose. Ask your contractor which parts of the soil can still be reached and for a written record of what was treated. If you can, ask for the pre-construction stages before the floor goes down.

Is anti-termite treatment part of a JSW One Homes build?

Ask the JSW One Homes team to state in writing whether anti-termite treatment is in your scope. JSW One Homes’ quality assurance plan and quality control procedure include regular site inspections, material inspections and workmanship evaluations, so ask how each treatment stage will be checked and recorded.